EasyManua.ls Logo

3Com III - Running the Group 2 and Group 3 Tests

3Com III
78 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Starting the Diagnostic Program 5-5
Running the Group 2 Test
The Group 2 test is called the Network Loopback Test. It tests
the 3C592-COMBO adapters ability to transmit and receive
data via the internal transceiver. This test requires installation of
a loopback plug at the adapters BNC transceiver connection.
Or, you can run the test on a nonproduction network on which
only the computer being tested is operating.
CAUTION: Running the Group 2 test while connected to an
active network can cause intermittent failures.
Assembling a Loopback Plug
If you do not have a loopback plug, you may be able to get
one from your authorized network supplier, or you can make
your own. To assemble the loopback plug, connect two
50-ohm network cable terminators to a T connector, as
shown in Figure 5-2. You can purchase the terminators from
your network supplier (3Com part number 3C535).
Figure 5-2 Assembling a Loopback Plug
Starting the Group 2 Test
To run the Group 2 test on a 3C592 EISA adapter, follow
these steps:
1 Connect the loopback plug to the round BNC connector
on the back of the adapter.
2 Start the Configuration and Diagnostic Program, as
described earlier in this chapter.
Terminator
Terminator
T connector

Table of Contents

Other manuals for 3Com III