EasyManua.ls Logo

3Ware 9500S-4LP - Tools and Equipment Required; Installation Overview

3Ware 9500S-4LP
126 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Appendix A. Installing the Battery Backup Unit
100 3ware 9000 Series Serial ATA RAID Controller Installation Guide
Tools and equipment required
Phillips-head screwdriver
Grounding strap
Battery Backup Unit (BBU) and battery
3ware 9000 series controller
Installation Overview
The Battery Backup Unit (BBU) attaches to the controller at three
points, as illustrated in Figures 1 through 3:
a Slots on the edge of the controller (visible after removing the
PCI bracket) match to clips on the BBU
b Receptacle on the controller matches to connector on the BBU
c Post hole on the controller mates to post on the BBU
Figure 1. Points of connection on the BBU (bottom view)
c) post
a) Clips
b) BBU connector

Table of Contents

Related product manuals