EasyManua.ls Logo

AAON MODGAS-XWR - Page 9

AAON MODGAS-XWR
38 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Zone
Zone
MODGAS-XWR2 Technical Guide
STAND-ALONE WIRING
9
Secondary Board 2V1IGN1S - Stand-Alone Wiring
Figure 6: Secondary Board 2V1IGN1S Stand-Alone Wiring Diagram
Secondary Board (2V1IGN1S) -
Stand-Alone Wiring
In this conguration, the Two Modulating Valves wiring on the facing
page is the Primary portion and Figure 6, below is the Secondary por-
tion, thus creating four modulating valves as one stage.
This configuration operates as Stand-Alone (Figure 6, below) or
communicating with an AAON Unit Controller (Figure 14, page 17).
NOTE: Up to 3 additional xed heat stages can be used by using
Heat Relays 2, 3 & 4 below and up to 12 more additional
xed stages can be added by using the 12-Relay E-BUS
Expansion Module. (Figure 8, page 11).
If using a MHGRV-X Controller along with the secondary MODGAS-
XWR2 Controller in Stand-Alone, the SAT Sensor always attaches to
the Primary MODGAS-XWR2 Controller.

Related product manuals