46 Standard Commissioning Process
• In this step, only select Install Cable Drivers. Till to finish successfully.
• Switch off the control power.
• Remove the daughter boards DB2 and DB3 to get access the X5 connector on control
hub.
• Connect XILINX platform cable USB II to X5 connector on control hub.
• Switch on the control power.