Standard Commissioning Process 67
Connected equipment inspecti
on
•
Fill in all necessary information from the
equipment report. Including protection relays,
MCB, integrated transformer
, motor and power cables.
Note:
Check every item carefully
.
66
68
Table of Contents
Main Page
Default Chapter
5
Table of Contents
5
Terms
9
Trademarks
10
1 Safety Instructions
11
Contents of this Chapter
11
2 Introduction to the Manual
13
Contents of this Chapter
13
Scope of Commissioning
13
Requirement for Reports
13
MV Drives Supportline Contact
14
3 Standard Commissioning Process
15
Pre-Commissioning Check Lists
15
Contents of this Chapter
15
Office Preparation Check List
15
Required Tools
16
Scope of Delivery
18
Checking the Pre-Conditions for Commissioning
18
Inspection of Installation
22
Converter Room
23
Converter
23
Motor
23
Commissioning Third-Party Equipments
24
Main Circuit Breaker (MCB)
24
Power Cables
24
Protection Relays
27
Motor
28
Insulation Resistance Measurements
28
Preparations
28
External MCB Insulation Test
28
Converter Insulaiton Test
29
Motor Insulation Test
30
Power Cables Insulation Test
31
Preparing the Converter for Start-Up
32
Connecting the Auxiliary Supply
32
Check Terminal X1 Terminal before Energizing Auxiliary Supply
32
Other Checking Items
34
Loading Software and Prepare Drivestartup
36
Loading Software to All the Control Boards
36
Commissioning Software Tools on PC
59
Cold Commissioning by Drivestartup
64
Create the New Project
64
Connected Equipment Inspection
67
Cold Commissioning
68
Hot Commissioning by Drivestartup
75
Close MCB and Load Power Module Software
75
Cooling and Heating System Testing
75
Motor First Run
77
Fly Start
78
Control from Overriding System
80
Motor Ramp up and down with Load
81
Vector Control
82
Grid Loss Ride through Test
84
Finalizing the Commissioning
84
Parameters Backup
84
SD Card Data Backup
85
Spare Parts Software Version
85
Customer Training
85
Customer Approval
86
Create the Commissioning Report
86
Prepare the Field Service Report by Drivestartup
87
Customer Documentation
94
Documentation and Backup Copies to MV Drives Supportline
94
Duration and Description of Commissioning
94
Duration and Description of Typical Commissioning
95
4 Option
97
MBU Commissioning
97
Insulation Test
100
Commissioning for MBU=0001 Option
100
Commissioning for MBU=0002 or MBU=0003 Option
102
SBU Commissioning
105
Safety
105
Software Requirements
105
Inspection of Installation
105
Insulation Test
106
Download Software
106
SBU Phase Order Check Procedure
108
SBU Cold Commissioning
111
SBU Hot Commissioning
124
Master/Follower Functionality
129
Contents of this Chapter
129
General
129
General Parameter Setting
131
Remote Connectivity
136
Contents of this Chapter
136
Make the Drive Ready
136
NETA-21 Setup
137
Finalizing the Connection
139
5 Preventive Maintenance
141
Contents of this Chapter
141
Maintenance Schedule
141
Regular Inspection
142
Preventive Replacement Schedule
142
Insulation Resistance Measurement
143
Converter Insulation Resistance
143
Transformer Insulation Resistance
143
Motor Insulation Resistance
144
Optical Fibers
144
Visual Check
144
Attenuation Measurement
144
Communication Test
145
Bypass Unit
146
Isolation Switches for Manual Bypass
146
Contactor for Auto Bypass
146
Other manuals for ABB ACS580MV
Quick Guide
54 pages
Hardware Manual
146 pages
Related product manuals
ABB ACS580
24 pages
ABB ACS580-01
82 pages
ABB ACS580-07
40 pages
ABB ACS580-0P
28 pages
ABB ACS580 Series
116 pages
ABB ACS580-01 Series
84 pages
ABB ACS560
514 pages
ABB ACS5000
186 pages
ABB ACS550-02
305 pages
ABB ACS510-01
247 pages
ABB ACS880
646 pages
ABB ACS880-01
26 pages