54 Standard Commissioning Process
• Please operate the converter according to the description of “DriveStartup”.
Loading the DSP software manually to power modules
• Necessary tools: 5.5 VDC power, USB to POF cable and fiber cable.
• Install the Tera term programing tool, select the default components.
• Check and confirm the drive has been discharged and door lock is released.
• Open the INU door and then switch off the control power supply.
• Connect the POF link to power module and USB to PC.