Make sure that it is safe to connect voltage:
nobody is working on the unit or circuits that are wired from outside into the cabinets
covers of the motor terminal boxes are on
cabinet doors are closed
the disconnecting device [Q1] is open.
Drive with the earthing/grounding switch [Q9] (option +F259): Open the earthing/grounding switch.
Close the auxiliary voltage switch [Q21].
Setting the supply unit parameters
Action
If the supply unit includes one supply module:
Check the correct voltage ranges by parameter 195.01 Supply voltage.
Reboot the control unit by parameter 196.08 Control board boot.
If the supply unit includes more than one supply module: Make sure that the value of parameter 195.31
Parallel connection rating id corresponds to the actual number of parallel-connected diode supply
modules:
Select the correct voltage range with parameter 195.30 Parallel type filter.
Select the correct supply unit type with parameter 195.31 Parallel connection rating id.
Reboot the control unit by parameter 196.08 Control board boot.
Check the correct voltage range, parameter 195.01 Supply voltage.
Reboot the control unit by parameter 196.08 Control board boot.
If you need more information on the use of the control panel, see ACX-AP-x assistant control panels
user's manual (3AUA0000085685 [English]).
Powering up the drive
Action
Close the disconnecting device of the supply unit.
Drive with main breaker [Q1] (option +F255): Unlock the withdrawn breaker, and crank it in.
WARNING!
Never use the start button of the air circuit breaker to close it. Start button bypasses normal
start-up procedure and may damage the module.
Make sure that the control panel [A59] is in the remote mode (Loc/Rem key of the panel).
Switch the Run enable and Start signals at digital input DI2 on (1) to start the operation of the supply
unit.
Turn the operating switch [S21] on the cabinet door to ENABLE/RUN (1) position.
Run enable starts the supply unit power up sequence. After the program has stepped through it (ap-
proximately 3 seconds), the drive DC link is charged, the main breaker is closed and the supply unit
is in operation and ready to the supply inverters.
Turn the operating switch [S21] to on (1) position to activate the Run enable signal and to close the
main breaker [Q1].