Manual for High Voltage Process Performance Motors
Commissioning Report - 86
3BFP 000 063 R0101 REV D
7 Test Run
7.1 First start (a few seconds only)
Note: Check that possible flood lubrication is on!
7.2 Second start (uncoupled, if possible)
Note: Check that possible flood lubrication is on!
Checking schedule and information
Direction of rotation (viewed from D-end):
Are there abnormal noises?
Are there abnormal noises?
Does the machine vibrate abnormally?
Bearing vibration level measured: D-end:__________ mm/s, rms; N-end:_________ mm/s, rms
Running:
Time Bearing temperature Bearing vibration levels Stator Stator winding temperature
D-end N-end D-end
mm/s
N-end
mm/s
Current Power
Factor
Excit.
Current
UVW
h:min
ºC ºCrmsrmsAcos φ A ºC ºC ºC
0:00
0:05
0:10
0:15
0:20
Comments:
Observations:
CW
CCW
no yes,
from:
machine run OK operation stops, why:
no yes,
from:
no yes,
where/how: