EasyManua.ls Logo

ABB Fimer PVI-10.0/12.5-TL-OUTD - Installation; General Conditions

ABB Fimer PVI-10.0/12.5-TL-OUTD
107 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
38
000021EG-F
General conditions
Equipment performance will be enhanced by proper equipment installation.
Staff authorized to carry out the installation must have received suitable
training on this type of equipment.
Equipment operation must be carried out by staff who comply with in-
structions in this manual.
For safety reasons only a qualied electrician, who has received training or/and has demostra-
ted skills and knowledge in operation of this unit, can install this inverter.
The installation is done by qualied installers and/or licensed electricians according to appli-
cable local regulations.
The connection of an inverter energy system to an electrical installation connected to the grid
shall be approved by the appropriate electrical distributor.
The installation must be carried out with the equipment disconnected from the grid and from
the photovoltaic generator.
When the photovoltaic panels are exposed to light, these supplies a direct current voltage to
the inverter.
5
Installation

Table of Contents

Related product manuals