EasyManua.ls Logo

ABB FPTC-02 - Mechanical Installation; Necessary Tools and Instructions; Unpacking and Examining the Delivery

ABB FPTC-02
96 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
5
Mechanical installation
Contents of this chapter
This chapter contains a delivery checklist and instructions on installing
the module.
Necessary tools and instructions
• Torx screwdriver (T10)
For a complete list of tools, see the applicable drive hardware manual.
Unpacking and examining the delivery
1. Open the option package.
2. Make sure that the package contains:
• FPTC-02 module
• STO cable
• ATEX label (with the ATEX classification markings)
• this manual.
3. Make sure that there are no signs of damage to any of the items.
Mechanical installation 35

Table of Contents