EasyManua.ls Logo

ABB FPTC-02 - Mechanical Installation; Necessary Tools and Instructions; Unpacking and Examining the Delivery

ABB FPTC-02
96 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
5
Mechanical installation
Contents of this chapter
This chapter contains a delivery checklist and instructions on installing
the module.
Necessary tools and instructions
Torx screwdriver (T10)
For a complete list of tools, see the applicable drive hardware manual.
Unpacking and examining the delivery
1. Open the option package.
2. Make sure that the package contains:
FPTC-02 module
STO cable
ATEX label (with the ATEX classification markings)
this manual.
3. Make sure that there are no signs of damage to any of the items.
Mechanical installation 35

Table of Contents

Related product manuals