Installation and commissioning guide
2750 515-1 EN, REV. 14, 2020-06-26
29
6. Put the washers and the nut (19) on the
pull-through cord.
CAUTION!
Make sure that the washers are in the
correct order.
G004515
19 Nut
20 Plain washer
21 Conical spring washer
22 Contact washer
7.
Lower the pull-through cord (12) through the
bushing.
G001893
8.
Apply Molykote Multilub to the pull-through cord
(12), and attach it to the inner terminal (32).
NOTE!
The terminal (32) has M8 threads.
G004516

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the ABB GOE Series and is the answer not in the manual?

ABB GOE Series Specifications

General IconGeneral
BrandABB
ModelGOE Series
CategoryIndustrial Equipment
LanguageEnglish

Related product manuals