EasyManua.ls Logo

ABB IRB 1200-7/0.7 - Replacing the Sealing Set on Tool Flange of Hygienic Robots

ABB IRB 1200-7/0.7
906 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
3.4.2 Replacing the sealing set on tool flange of Hygienic robots
General
To ensure the sealing efficiency, sealing parts on the tool flange of Hygienic robots
is recommended to be replaced at an interval of 12 months or 60000 operating
hours.
Location of the sealing set
Parts of the sealing set on the tool flange of Hygienic robots are located as shown
in the figure.
xx2100001485
Recommended to replace at a 12-month interval.Gasket, axis 6, HygienicA
Recommended to replace at a 12-month interval.Seal ring unitB
Replace if damaged.Stainless shaftC
Recommended to replace at a 12-month interval.Sealing washerD
Replace if damaged.Stainless screwsE
Required spare parts
Note
The spare part numbers that are listed in the table can be out of date. See the
latest spare parts of the IRB 1200 via myABB Business Portal,
www.abb.com/myABB.
Continues on next page
144 Product manual - IRB 1200
3HAC046983-001 Revision: S
© Copyright 2014 - 2021 ABB. All rights reserved.
3 Maintenance
3.4.2 Replacing the sealing set on tool flange of Hygienic robots

Table of Contents

Related product manuals