EasyManua.ls Logo

ABB IRB 1200-7/0.7 - Page 760

ABB IRB 1200-7/0.7
906 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
NoteAction
If the robot is to be calibrated with fine
calibration:
Remove all external cable packages
(DressPack) and tools from the robot.
Removing the motor with pulley
Preparations before removing the axis-5 motor, pulley or shaft
NoteAction
Decide which calibration routine to use, and take
actions accordingly prior to beginning the repair
procedure.
1
xx1300002581
Jog all axes to zero position.2
DANGER
Turn off all:
electric power supply
hydraulic pressure supply
air pressure supply
to the robot, before entering the robot working
area.
3
CAUTION
For robots with protection type Clean Room
For robots with food grade lubrication
For robots with protection type Hygienic
Always cut the paint with a knife and grind the
paint edge when disassembling parts of the robot!
See Cut the paint or surface on the robot before
replacing parts on page 158.
4
Continues on next page
760 Product manual - IRB 1200
3HAC046983-001 Revision: S
© Copyright 2014 - 2021 ABB. All rights reserved.
4 Repair
4.6.7 Replacing the axis-5 motor with pulley
Continued

Table of Contents

Related product manuals