NoteAction
If the robot is to be calibrated with fine
calibration:
Remove all external cable packages
(DressPack) and tools from the robot.
Removing the motor with pulley
Preparations before removing the axis-5 motor, pulley or shaft
NoteAction
Decide which calibration routine to use, and take
actions accordingly prior to beginning the repair
procedure.
1
xx1300002581
Jog all axes to zero position.2
DANGER
Turn off all:
• electric power supply
• hydraulic pressure supply
• air pressure supply
to the robot, before entering the robot working
area.
3
CAUTION
For robots with protection type Clean Room
For robots with food grade lubrication
For robots with protection type Hygienic
Always cut the paint with a knife and grind the
paint edge when disassembling parts of the robot!
See Cut the paint or surface on the robot before
replacing parts on page 158.
4
Continues on next page
760 Product manual - IRB 1200
3HAC046983-001 Revision: S
© Copyright 2014 - 2021 ABB. All rights reserved.
4 Repair
4.6.7 Replacing the axis-5 motor with pulley
Continued