EasyManua.ls Logo

ABB LVS Digital FC610 - 4.4.4 Demand Integration Time Setting; 4.4.5 Maintenance Setting

ABB LVS Digital FC610
61 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
CONFIGUR AT ION PAGES H MI MP53/MP 56
1TNC9 2825 0M0201 46
4.4.4 Demand integration time setting
The demand integration time in FC610 are selectable from 2 s, 10 s, 5 min, 8 min, 10 min, 15 min,
20 min, 30 min and 60 mins. The integration time is calculated by the sliding method. The slid-
ing time interval is 1 second when the integration time is selected as 2 or10 seconds. When the
integration time is 5, 8, 10, 20, 30, 60 minutes, the sliding time interval is 1 minute
Level 1
Level 2
Level 3
Value range
(PARA: Parameters)
(IPAM: Integration
period of average
and maximum)
(I_IT: Integration time
of current)
2 seconds,
10 seconds,
5 minutes,
8 minutes,
10 minutes,
15 minutes,
20 minutes,
30 minutes,
60 minutes
(U_IT: Integration time
of voltage)
(F_IT: Integration time
of frequency)
(P_IT: Integration time
of power)
4.4.5 Maintenance setting
Level 1
Level 2
Level 3
Value range
(MAIN:
Maintenance)
(PCRP: 1/2 period
curves record point *)
30 %-70 %
(RUN: Running time)
1-65534
Off:65535 (65535)
(INSE: Insertion cycle)
1-65534
Off:65535 (65535)
*) The event curve record position refers to the position of the record point where the event
occurs in the entire event record, such as 30 %, which means that the record at the time of the
event is located at 30 % of a record.

Table of Contents

Related product manuals