EasyManua.ls Logo

ABB RED615 - Settings

ABB RED615
896 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Table 648: VMHAI Output signals
Name Type Description
ALARM BOOLEAN Alarm signal for THD
10.2.7 Settings
Table 649: VMHAI Non group settings
Parameter Values (Range) Unit Step Default Description
Operation 1=on
5=off
1=on Operation Off / On
Demand interval 0=1 minute
1=5 minutes
2=10 minutes
3=15 minutes
4=30 minutes
5=60 minutes
6=180 minutes
2=10 minutes Time interval for demand calculation
Demand window 1=Sliding
2=Non-sliding
1=Sliding Demand calculation window type
THD alarm limit 1.0...100.0 % 0.1 50.0 THD alarm limit
10.2.8 Monitored data
Table 650: VMHAI Monitored data
Name
Type Values (Range) Unit Description
Max demand THD
UL1
FLOAT32 0.00...500.00 % Maximum demand THD
for phase A
Max demand THD
UL2
FLOAT32 0.00...500.00 % Maximum demand THD
for phase B
Max demand THD
UL3
FLOAT32 0.00...500.00 % Maximum demand THD
for phase C
Time max dmd THD
UL1
Timestamp Time of maximum
demand THD phase A
Time max dmd THD
UL2
Timestamp Time of maximum
demand THD phase B
Time max dmd THD
UL3
Timestamp Time of maximum
demand THD phase C
3SMHTHD_A FLOAT32 0.00...500.00 % 3 second mean value of
THD for phase A
DMD_THD_A FLOAT32 0.00...500.00 % Demand value for THD
for phase A
3SMHTHD_B FLOAT32 0.00...500.00 % 3 second mean value of
THD for phase B
Table continues on next page
1YHT530004D05 D Section 10
Power quality measurement functions
615 series 771
Technical Manual

Table of Contents

Other manuals for ABB RED615

Related product manuals