EasyManua.ls Logo

ABB REG670 2.0 IEC - Page 9

ABB REG670 2.0 IEC
268 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Section 9 Establishing connection and verifying the LON
communication............................................................... 89
Communication via the rear ports ....................................................89
LON communication....................................................................89
The LON Protocol........................................................................90
Hardware and software modules.................................................90
Optical budget calculation for serial communication with LON ........92
Section 10 Establishing connection and verifying the IEC 61850
communication............................................................... 93
Overview...........................................................................................93
Setting the station communication....................................................93
Verifying the communication............................................................ 94
Section 11 Testing IED operation.....................................................95
Preparing for test.............................................................................. 95
Requirements.............................................................................. 95
Preparing the IED to verify settings.............................................96
Activating the test mode................................................................... 97
Preparing the connection to the test equipment............................... 98
Connecting the test equipment to the IED........................................98
Releasing the function to be tested.................................................. 99
Verifying analog primary and secondary measurement................. 100
Testing the protection functionality................................................. 101
Section 12 Testing functionality by secondary injection.................103
Testing disturbance report..............................................................103
Introduction................................................................................103
Disturbance report settings........................................................103
Disturbance recorder (DR)........................................................ 103
Event recorder (ER) and Event list (EL).................................... 104
Identifying the function to test in the technical reference manual ..105
Differential protection......................................................................105
Transformer differential protection T3WPDIF............................105
Verifying the settings............................................................ 105
Completing the test.............................................................. 106
High impedance differential protection HZPDIF ....................... 106
Verifying the settings............................................................ 106
Completing the test.............................................................. 107
Generator differential protection GENPDIF ..............................107
Verifying the settings............................................................ 107
Completing the test.............................................................. 108
Restricted earth-fault protection, low impedance REFPDIF .....108
Verifying the settings............................................................ 108
Table of contents
Generator protection REG670 2.0 IEC 3
Commissioning manual

Table of Contents

Related product manuals