EasyManua.ls Logo

ABB REG670 2.0 IEC - 11.3 Preparing the connection to the test equipment; 11.4 Connecting the test equipment to the IED

ABB REG670 2.0 IEC
268 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Path in the local HMI under Main menu/Configuration/Communication/SLM
configuration/Rear optical LON port
Table 9: ADE Non group settings (basic)
Name
Values (Range) Unit Step Default Description
Operation Off
On
- - Off Operation
TimerClass Slow
Normal
Fast
-
- Slow Timer class
Path in the local HMI under Main menu/Configuration/Communication/SLM
configuration/Rear optical LON port
Table 10: LON commands
Command Command description
ServicePinMsg Command with confirmation. Transfers the node address to the LON Network Tool.
9.2 Optical budget calculation for serial communication
with LON
Table 11: Example
Distance 1 km
Glass
Distance10 m
Plastic
Maximum attenuation -11 dB - 7 dB
4 dB/km multi mode: 820 nm - 62.5/125 um 4 dB -
0.3 dB/m plastic: 620 nm - 1mm - 3 dB
Margins for installation, aging, and so on 5 dB 2 dB
Losses in connection box, two contacts (0.75 dB/contact) 1.5 dB -
Losses in connection box, two contacts (1dB/contact) - 2 dB
Margin for repair splices (0.5 dB/splice) 0.5 dB -
Maximum total attenuation 11 dB 7 dB
Section 9 1MRK502053-UEN B
Establishing connection and verifying the LON communication
92 Generator protection REG670 2.0 IEC
Commissioning manual

Table of Contents

Related product manuals