Introduction to the installation and
commissioning manual
Chapter 1
Introduction
1.5 Revision notes
Connection diagram, Multi breaker arr. Single phase tripping arr. 1MRK 002 801-EA
Configuration diagram A, Single breaker with single or double busbar 1MRK 004 500-86
Configuration diagram B, Single breaker with singel or double busbar 1MRK 004 500-87
Configuration diagram C, Multi breaker such as 1 1/2 or ring busbar arr. 1MRK 004 500-88
Configuration diagram D, Multi breaker such as 1 1/2 or ring busbar arr. 1MRK 004 500-89
Setting example 1, 400 kV Long overhead power line with 1 1/2 CB arr. 1MRK 506 267-WEN
Setting example 2, 230 kV Extremely long overhead power line, double bus,
single CB arr.
1MRK 506 268-WEN
Setting example 3, 132 kV Short overhead power line, double bus, single CB
arr.
1MRK 506 269-WEN
Connection and Installation components 1MRK 013 003-BEN
Test system, COMBITEST 1MRK 512 001-BEN
PCM600, Protection and Control IED Manager 1MRS755552
Getting started guide 1MRK 500 065-UEN
SPA signal list for IED670 1MRK 500 075-WEN
IEC 61850–8–1 signal list for IED670 1MRK 500 077-WEN
Latest versions of the described documentation can be found on www.abb.com/substationautomation
Documents related to REL670 Identity number
Revision Description
- First release
A First revision, addition of SPA protocol, LON protocol and IEC 60870-5-103 proto-
col.

Table of Contents

Other manuals for ABB REL670

Related product manuals