66
Overview Chapter 10
Configuring the IED and changing
settings
1 Overview
The customer specific values for each setting parameter and a configuration file have to be avail-
able before the IED can be set and configured, if the IED is not delivered with a configuration.
Use the PCM600 configuration tool to verify that the IED has the expected configuration. A new
configuration is done with the CAP tool. The binary outputs can be selected from a signal list
where the signals are grouped under their function names. It is also possible to specify a user-de-
fined name for each input and output signal.
Each function included in the IED has several setting parameters which have to be set in order
to make the IED behave as intended. A factory default value is provided for each parameter. A
setting file can be prepared using the parameter setting tool (PST), which is available in the
PCM600 package.
All settings can be:
Entered manually through the local HMI.
Downloaded from a PC, either locally or remotely using SMS/SCS. Front or rear
port communication has to be established before the settings can be downloaded.

Table of Contents

Other manuals for ABB REL670

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the ABB REL670 and is the answer not in the manual?

ABB REL670 Specifications

General IconGeneral
BrandABB
ModelREL670
CategoryProtection Device
LanguageEnglish

Related product manuals