EasyManuals Logo

ABB RER615 Technical Manual

ABB RER615
869 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #642 background imageLoading...
Page #642 background image
9.2.8 Monitored data
9.2.8.1 DCSXSWI Monitored data
Table 669: DCSXSWI Monitored data
Name Type Values (Range) Unit Description
POSITION Dbpos
0=intermediate
1=open
2=closed
3=faulty
Apparatus posi-
tion indication
9.2.8.2 ESSXSWI Monitored data
Table 670: ESSXSWI Monitored data
Name Type Values (Range) Unit Description
POSITION Dbpos
0=intermediate
1=open
2=closed
3=faulty
Apparatus posi-
tion indication
9.2.9 Technical revision history
Table 671: DCSXSWI Technical revision history
Technical revision Change
B
Maximum and default values changed to 60 s
and 30 s respectively for
Event delay
settings.
C
Outputs OPENPOS and CLOSEPOS are forced
to “FALSE” in case status is Faulty (11).
Table 672: ESSXSWI Technical revision history
Technical revision Change
B
Maximum and default values changed to 60 s
and 30 s respectively for
Event delay
settings.
C
Outputs OPENPOS and CLOSEPOS are forced
to “FALSE” in case status is Faulty (11).
Control functions 1MRS758755 C
642 REC615 & RER615
Technical Manual

Table of Contents

Other manuals for ABB RER615

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the ABB RER615 and is the answer not in the manual?

ABB RER615 Specifications

General IconGeneral
BrandABB
ModelRER615
CategoryRelays
LanguageEnglish

Related product manuals