1. Change the magnitude and angle of phase-to-phase voltage to achieve
impedances at test points P1, P2, …, P8.
2. For each test point, observe that the output signals STELEMST, STNDZL1
and STNDZL2 are activated.
Change setting parameter CharStartZ< to Quadrilateral and set OpLoadEnch to
On. Also, Set X1Start, REOverRLStart, XEOverXLStart, LineAng, AngLd,
RFPEStart and RFPPStart to default values. Set RLd such that it is lower than
RFPEStart/RFPPStart.
Phase-to-earth fault - quadrilateral characteristic
GUID-AE99E2DB-5537-4B43-938F-3AC9DBB9669A v2
Test points that are to be considered for measurement accuracy of set reactive reach
are shown in Figure
15 and Table 17.
IEC15000431-1-en.vsdx
R
jX
RLdRLd
RFPEStart RFPEStart
P2
P1
P3
P4
P8
P9
P10
P11
P13
P14
P15
P16
P7
P5
P6
ArgLd
(
)
(
)
P12
X1Start (1+XEOverXLStart)
IEC15000431 V1 EN-US
Figure 15: Proposed test points for phase-to-earth loop of quadrilateral
characteristic in solidly earthed system
Section 10 1MRK 506 377-UEN C
Testing functionality by secondary injection
86 Railway application RER670 2.2 IEC
Commissioning manual