EasyManua.ls Logo

ABB SACE Emax E4.2 - Opening Command Test

ABB SACE Emax E4.2
271 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
ABB | SACE Emax 2
48 | © 2013 ABB | 1SDH001000R0002 - L7804
Ekip Dip protection release | 4 - Test
Opening command test
The opening command test can be performed directly on the release or from Ekip Connect.
To perform the release test:
Phase Operation
1 Make sure that the CB is closed and that there are no primary currents present
2 Connect a module to the front test connector of frontal test
3 Press the iTest push-button for at least 9 seconds
4 Check that the CB opens and that the TU Reset button comes out
To perform the test from Ekip Connect:
Phase Operation
1 Make sure that the CB is closed and that there are no primary currents present
2 Connect Ekip T&P or Ekip Bluetooth to the front test connector
3 Start the communication with Ekip Connect
4 Select the Trip Test command
5 Check that the CB opens and that the TU Reset button comes out
Further information on Ekip Connect is available from the web site http://www.abb.com/
abblibrary/DownloadCenter/, in particular with the manual 1SDH000891R0002.

Table of Contents

Other manuals for ABB SACE Emax E4.2

Related product manuals