EasyManua.ls Logo

ABB Symphony Harmony Series - Page 370

ABB Symphony Harmony Series
402 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
WBPEEUI240751C0 PR3 - 1
PR3
I/O Module Installation
Purpose/Scope
This procedure gives the steps required to install an I/O mod-
ule. The installation procedure is the same for all I/O modules.
Also, the procedure is the same whether installing modules on
redundant or nonredundant bases.
NOTE: Always follow the instructions given in
Special Handling
in Section 5
when handling an I/O module.
Parts
None.
To o l s
Flat-blade or Phillips screwdriver.
Safety Considerations
Procedure
1. Verify the block location. I/O modules are keyed to compat-
ible bases to prevent a mismatch.
2. Grasp the retractable handle when inserting the I/O mod-
ule. Insure the handle is extended completely so that the fas-
tening screw does not stick out from the back of the module
(Fig. PR3-1).
3. Position the I/O module on the base. The I/O module is
properly positioned when the posts protruding from the base
line up with the alignment holes on the back of the I/O
module.
NOTE: Do not use the fastening screw to align the I/O module.
4. Gently push the module in until the front of the base and
the front of the I/O module are flush. This should not require
1 min.
WARNING
1. An I/O module should not be inserted or removed with power
applied when located in a class I, division 2 hazardous location
unless the area is known to b e nonhazardous.
W1

Table of Contents

Other manuals for ABB Symphony Harmony Series

Related product manuals