Home
ABB
Battery Charger
Terra 24
Page 45
ABB Terra 24 - Page 45
81 pages
Manual
Save Page as PDF
To Next Page
To Next Page
To Previous Page
To Previous Page
Loading...
All rights reserved.
A
TTENTION:
YOU
MUST
CONN
ECT L1, L2, L3, N
AND PE WIR
ES BEFORE PO
WERING UP THIS CHARGER.
F
AILURE T
O
DO SO WILL CAUSE DAMAGE TO
THE
CHARGER
AND VOID
W
ARRNTY
L1, L2, L3, N
AND PE
LABELS
ARE ON THE TERMINAL
BLOCK
44
46
Table of Contents
Main Page
Table of Contents
5
Introduction
8
Preface
8
Intended Document Users
8
Terra DC Wallbox Hardware Ordering Details
8
Signs
9
Owner Responsibilities
10
Tilting and Handling
10
Sharp Edges
11
Electric Hazards
11
Environment and Disposal of Waste
11
Installation Safety
11
Options
25
Mounting the Terra DC Wallbox
25
Install Cable Gland(S) or Connect Conduit to the Unit
29
Connect Cables
31
Connect PE of Power Cable
31
Connect Power Cable
31
Instruction for Mounting the DC Wallbox Gun Holders
32
General
32
General Description
32
Mounting Instructions
33
Commissioning
35
Commissioning Preparation
35
Maintenance and Cleaning of the Cabinet
36
Recommended Periodic Maintenance
36
Cleaning of the Cabinet
36
Technical Data
37
Electrical Data
37
Mechanical Data
38
Environment
38
Certifications
38
Contact Information
39
Appendix A - Mounting Points
40
Terra DC Wallbox Charger Wall Mounting
40
Appendix B - Disposal Instruction
41
Directive on Waste Electrical and Electronic Equipment (WEEE - 2012/19/EU)
41
Appendix C - Pedestal Requirements
42
Introduction
49
Preface
49
Intended Document Users
49
Terra DC Wallbox Hardware Ordering Details
49
Signs
50
Owner Responsibilities
51
Tilting and Handling
51
Sharp Edges
51
Electric Hazards
51
Installation Safety
52
Environment and Disposal of Waste
52
Description of the Product
53
Overview of the System
53
Complete Overview
53
External View
54
Inside View
55
Installation Planning and Design
56
Internet Connection
56
Internet Via Cellular Connection
56
Internet Via Ethernet Connection
56
Electrical Requirements
57
Required Electrical Grid Configuration
57
Overcurrent Protection Device
58
Conduit for Power Input Wires
58
Specification for Power Input Wires
58
Conduit for Ethernet Cable
59
DC Wallbox Placement
59
Specification for Ethernet Cable
59
Charging Cable Reach
59
DC Wallbox Position with Respect to Parking Space
60
Required Space for Installing and Maintaining the DC Wallbox
61
Ventilation and Airflow Required for the DC Wallbox
61
Considerations for Where to Position DC Wallbox Vertically
62
Installation Instructions
62
About Construction
62
Instruction for a Wall Bearing
62
Mounting on a Pedestal
62
Power Feed
63
Internet Connection
63
Receiving, Placing and Connecting
63
Receiving the Wallbox
63
Unpacking the Charging and Mounting Preparations
64
Unpacking
64
Move Cabinet to Position
65
Options
65
Mounting the Terra DC Wallbox
65
Mounting the Terra DC Wallbox
66
Install Cable Gland(S) or Connect Conduit to the Unit
69
Connect Cables
71
Connect PE of Power Cable
71
Connect Power Cable
71
Instruction for Mounting the DC Wallbox Gun Holders
72
General
72
General Description
72
Mounting Instructions
72
Commissioning
74
Commissioning Preparation
74
Maintenance and Cleaning of the Cabinet
75
Recommended Periodic Maintenance
75
Cleaning of the Cabinet
75
Technical Data
76
Electrical Data
76
Mechanical Data
77
Environment
77
Certifications
77
Contact Information
78
Appendix A - Mounting Points
79
Terra DC Wallbox Charger Wall Mounting
79
Appendix B - Disposal Instruction
80
Directive on Waste Electrical and Electronic Equipment (WEEE - 2012/19/EU)
80
Appendix C - Pedestal Requirements
81
Related product manuals
ABB Terra AC
54 pages
ABB Terra 53
33 pages
ABB Terra 124
117 pages
ABB Terra 360 CE
134 pages
ABB Terra AC Series
58 pages
ABB Terra DC wallbox
20 pages
ABB InCharge Terra 184
117 pages
ABB Terra 94 North America
116 pages
Terra HP Generation 4 CE Ionity
98 pages
ABB TPL67-C36
128 pages
ABB TPL73-A30
149 pages
ABB TPS52-F31
132 pages