EasyManua.ls Logo

ABB TPS 48D01 - Page 25

ABB TPS 48D01
130 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Operation Manual / TPS48-D/E.. - TPS61-D/E..
Safety
2
Safe operation and maintenance
2.6
Page 23
April 2015 HZTL2410_EN Revision D
Before starting work, carry out visual inspection of working area.
Remove any obstacles and objects lying around.
Before start-up / commissioning, check all pipes from and to
turbocharger for damage and leaks.
Don't work in any way that could impair safety when working on
turbocharger.
After about every 12 hours of operation or at least once a day, inspect
turbocharger for visible damage and defects.
Immediately report any damage or changes in operational
performance to person responsible.
If damage is discovered, immediately shut down turbocharger and
secure it against inadvertent or unauthorized use.
When switching on auxiliary power sources (hydraulics, pneumatics,
electricity, water), keep an eye open for any hazards resulting from
supplying these power sources.
It is possible that detergents or solvents will be used for cleaning. In this
case, the safety instructions of the Hazard due to operating materials and
supplies section in this chapter must always be observed.
Protect the floor against unintentional penetration of detergents or
solvents before starting cleaning operations.
Wear appropriate protective clothing.
Inspect the electric cables for abrasion and damaged areas before and
after your cleaning work.
© Copyright 2015 ABB. All rights reserved.

Table of Contents

Related product manuals