Operation Manual / TPS48-D/E.. - TPS61-D/E..
rbine cleaning during operation
Page 62
April 2015 HZTL2410_EN Revision D
Wet cleaning methods
Process with short water injection time (3 x 30 seconds cleaning)
The cleaning process with short water injection time is used for
turbocharger designs without additional sealing by means of C-rings.
The process is based on the principle of thermal shock in combination
with a subsequent flushing phase.
Process with long water injection time (10 minutes cleaning)
The cleaning process with a long water injection time is used for
turbocharger designs with additional sealing by means of C-rings.
Based on a 10-minute injection phase, this cleaning process utilises the
water solubility of the dirty deposits.
Choice of cleaning method
If you need information about the choice of cleaning method (short /
long), you can contact the engine builder or an official ABB
Turbocharger service station.
© Copyright 2015 ABB. All rights reserved.