EasyManuals Logo

ABB TPS48 Series User Manual

ABB TPS48 Series
132 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #48 background imageLoading...
Page #48 background image
Operation Manual / TPS48-D/E.. - TPS61-D/E..
Operation
4
Servicing work
4.2
Page 46
© Copyright 2016 ABB. All rights reserved.
September 2016 HZTL2410_EN Revision E
Service work every 25 … 50 hours
Visual inspection for air, exhaust gas, water and oil leaks.
Record operating data and enter it in the engine logbook.
Clarify the cause of any variances.
CAUTION
Unknown changes during operation
The consequences can range from an impairment to a breakdown.
Have unknown causes clarified by an ABB Turbocharging service
station.
Servicing work according to the engine manufacturer's instructions
Clean or replace oil filter in supply line to turbocharger when engine is
not running.
Service work in accordance with instructions on rating plate
(In general, after 8000 - 12000 hours of operation)
Rotor and bearing parts must be inspected and assessed by an ABB Tur-
bocharging Service Station. The following work can be carried in prepara-
tion.
Remove cartridge group as described in chapter Disassembly and as-
sembly.
Measure clearances.
Clean turbine and compressor casings and check them for cracks and
erosion / corrosion.
Clean bearing casing and blow air through oil ports / holes.
Clean nozzle ring and check for cracks and erosion.
4.2.1
4.2.2
Oil filter
4.2.3

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the ABB TPS48 Series and is the answer not in the manual?

ABB TPS48 Series Specifications

General IconGeneral
BrandABB
ModelTPS48 Series
CategoryIndustrial Equipment
LanguageEnglish

Related product manuals