Operation Manual / TPS48-D/E.. - TPS61-D/E..
Cleaning components mechanically
Page 75
© Copyright 2016 ABB. All rights reserved.
September 2016 HZTL2410_EN Revision E
To shorten the soaking time the liquid can be heated to maximum
60 ºC.
Heating up of cleaning agents and operating fluids
When cleaning agents or operating fluids are heated up, explosive va-
pours can be produced which are hazardous to health.
Observe the information in the material safety data sheet.
Wear a respiratory mask according to material safety data sheet.
Water and dirt in the cartridge group
If water or dirt gets into the cartridge group, the turbocharger function
may be impaired and parts in the cartridge group may be damaged.
Place the cartridge group on suitable wooden or metal supports (01).
Maintain dimension (B) for the supports (01), so that the cartridge
group does not submerge too deep.
Allow the layers of dirt on the turbine to soak for four hours.