Zenith ZTX Series ATS, OPERATION, MAINTENANCE, AND INSTALLATION GUIDE
2.5 Sequence of Operations
2.5.1 Switching sequence / Automatic
2.5.1.1 SOURCE 1 Priority
(SOURCE 2 = Generator)
The switching sequence can be
summarized in the following steps:
An anomaly occurs on SOURCE 1
Override momentary S1 outage delay
Generator start
SOURCE 2 OK
Transfer from S1 to S2 delay
Transfer switch (SOURCE 2) to
position II
The re-transfer sequence can be
summarized in the following steps:
SOURCE 1 is restored
Transfer from S2 to S1 delay
Transfer switch (SOURCE 1) to
position I
Generator stop delay
Generator stop
SOURCE 2 off