EasyManua.ls Logo

AccuAir SwitchSpeed - ECU Mounting Procedures; ECU Mounting Considerations; ECU Mounting Step-by-Step

AccuAir SwitchSpeed
31 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
ECU Mounting:
ECU Mounting Considerations
The ECU is 100% weather-proof and can be mounted under vehicle next to
the valves.
The ECU can be mounted upright or on its back as seen below. (If back
mounted, back tabs must be removed)
The following diagrams illustrate both “Standard” and “Optional” mounting
congurations.
Bottom Mounting (Standard):
See ECU Mounting Template
on page 16.
Back Mounting (Optional):
See ECU Mounting Template
on page 18.
Step-by-Step
1.) Find a at location near the VU4 (Valve Unit) to mount the ECU.
2.) Plug-In the Valve Harness while nding the mounting position to make sure
that it reaches.
3.) Transfer hole pattern from the ECU Mounting Template on pages 16 & 18.
4.) Drill holes with a 3/16” drill bit and bolt the ECU down with the included
#10-32 Allen head cap-screws.
For optional mounting,
remove back tabs with
diagonal cutters and a le.

Related product manuals