EasyManua.ls Logo

Acer Aspire V7-582 - Main Unit Reassembly Process; Replacing the IO Board

Acer Aspire V7-582
376 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Machine Maintenance Procedures 3-69
Main Unit Reassembly Process 0
Replacing the IO Board 0
1. Place the IO board (A) on the top assembly (Figure 3-85).
Figure 3-85. IO Board Location
2. Install and secure one (1) screw (D) securing the IO board in place (Figure 3-86).
3. Connect the IO board FPC (C) to IO board connector (B) (Figure 3-86).
Figure 3-86. Replacing the IO Board
A
D
B
C

Table of Contents

Related product manuals