2-22 Assemble Bottom Cover
1.Assemble Bottom Cover and Bottom
Cover Shielding
2.Screw 2 screws (as red circle) and
stick 1 mylar (as yellow square)
2-23 Assemble LVPS
1. Assemble 2 tenons (as blue square),put in
interupt switch
2.Plug 2 connectors (as red square)
3.Screw 4 screws (as red circle)