2-28 Subject to Export Control, see Cover Page for details.
E. SWR Meter Verification
TEST EQUIPMENT: None
1. Press POWER Key to turn ON the Test Set. Allow Test Set to warm up before continuing
with Verification Procedure.
2. With the System Menu displayed, press the 4 Key to display the ANT-Cable Test Screen.
3. Press the F1 “Edit” Key to highlight the “Type” field. Using the Arrow Keys ( ), select
SWR. Press the F1 “Done” Key to store the setting.
4. Press the F4 “Cal” Key. The VSWR CAL pop-up screen appears. Follow instructions on
the screen.
5. When “Calibration Complete” is displayed, press the F5 “Enter” Key to store the settings.
6. Using the Arrow Keys ( ), move the cursor to the Span field.
7. Press the F1 “Enter” Key to highlight the field. Enter “998.” Press the F1 “Done” Key to
store the setting.
8. Connect BNC T-Connector to the SWR Connector.
9. Connect a 20 dB Pad to each open connector of BNC T-Connector.
10. Allowing minimum 2 sweeps (updates) of the display, verify SWR Reading is 2:1 (± 10% -
2 to 300 MHz) (± 20% - 300 to 1000 MHz).