Maintenance
DD+DIS013.02E
Section 12 / 2 ADC Solo Edition 1, Revision 10
(Type 5155 / 100/200)
2 General Information
These maintenance instructions must be considered confidential.
To ensure quality and functional reliability of the system all the points listed
below (minimum maintenance points) must be carried out.
• The maintenance points have been arranged in a chronologically suitable
order to make the work routines as efficient as possible.
The sequence of the maintenance points in the checklist (see appendix) is
identical with these maintenance instructions.
• If there is a detailed description for a certain maintenance point in the
service documentation, this will be noted in the column "details".
• During the maintenance procedure always consider the safety instructions,
see TECHNICAL DOCUMENTATION section 1 / 1.
• Please check if it is necessary to include country specific regulations as
additional maintenance points!
Only for Systems with DRA Contract:
In systems with DRA Contract the infocounters are checked and evaluated in
regular intervals by the GSC. If there is an indication of an upcoming defect,
this is noted in the DRA Report and sent to the respective NSO with
instructions for measures possibly required on the machine.
Therefore we recommend to contact your NSO about this subject before
maintenance, in order to perform these recommended measures in addition
to the "must" maintenance points.
2.1 Maintenance Frequency
The maintenance has to be carried out:
• every 15.000 cycles or
• every 6 months
2.2 Required Time
approximately 3 h