Installation and Operation Safety 2
400/54 Premium Shielded NMR Magnet System Product Overview 29
System mechanical stability
The antivibration legs supplied with the system MUST be leveled
and bolted to the floor using the relevant holes in the base fixing
plate. Perform this operation at the beginning of the magnet
installation, before the magnet is energized.
Do not stand on the legs hoods at any time, to avoid affecting the
stability of the system. Protective leg hood covers are fitted to
prevent this situation from happening.