Do you have a question about the Agilent Technologies 7000 Series and is the answer not in the manual?
Brand | Agilent Technologies |
---|---|
Model | 7000 Series |
Category | Industrial Equipment |
Language | English |
Lists abbreviations used in the manual for clarity and reference.
Provides general information about the instrument's capabilities and features.
Highlights critical safety information for instrument operation and handling.
Details the hazards and necessary safety measures when using hydrogen gas.
Lists essential precautions for safe instrument operation and maintenance.
Defines the proper use of Agilent products and handling guidelines.
Discusses GC column types and restrictions for use with the mass spectrometer.
Explains the importance and procedure for conditioning GC columns before use.
Step-by-step guide for installing capillary columns in a specific inlet type.
Guide for connecting columns to the GC/MS interface using self-tightening nuts.
Procedure for installing the crucial tip seal in the GC/MS interface.
How to operate the MS using the Agilent MassHunter data acquisition software.
Configuring network settings and viewing instrument parameters via WUI.
Pre-operation checks and verification steps before powering on the MS.
Procedure for achieving and monitoring vacuum levels in the MS.
Step-by-step guide for safely returning the MS to atmospheric pressure.
Setting temperature setpoints for MS ion source and mass filters.
Procedure for performing automated tuning of the MS in EI mode.
Preparatory steps and general safety information before maintenance.
Overview of routine maintenance tasks and their recommended frequencies.
Safety measures for high voltage and hot instrument parts.
Precautions against ESD damage to sensitive electronic components.
Step-by-step guide to access internal components via the front analyzer chamber.
Procedures for removing and disassembling EI HES and EI XTR ion sources.
Procedures for cleaning and reassembling EI HES and EI XTR ion sources.
Procedures for installing and removing EI HES and EI XTR ion sources.
Steps to remove and install filaments for EI HES and CI sources.
Steps to properly close analyzer chambers and replace covers.
Procedure for replacing the Electron Multiplier horn in the detector.
Overview of maintenance requirements unique to CI operation.
Procedure for swapping an EI XTR source with a CI source.
Procedure for installing the 7010 Series CI source.
Procedure for swapping a CI source with an EI HES.
Steps for correctly reassembling the CI source after maintenance.
Procedure for removing a filament from the CI source.
Procedure for installing a new filament into the CI source.