EasyManua.ls Logo

Agilent Technologies DS102 1Ph

Agilent Technologies DS102 1Ph
135 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Technical Description
Scheduled Maintenance Cards
5
Dual Stage Rotary Vane Pumps User Manual/ 87-900-937-01(L) 85/140
Scheduled Maintenance Cards
Tab. 9
No. FREQUENCY PUMP STATUS (*) OPERATION
01 MONTHLY R OIL LEVEL CHECKING
02 TWICE
YEARLY
S CLEANING THE INLET FILTER
(*) R=RUNNING S=STOPPED
NOTE
When the pump is equipped with:
a filter for dust on the inlet side
a condensation separator on the inlet side
these items must also be maintained, by following the Manufacturer’s
instructions.
NOTE
The numbers used in the drawings on the Scheduled Maintenance Cards are
those used in Figure View of the pump.

Related product manuals