EasyManua.ls Logo

Allied Telesis AT-GS908M - Figure 7: Shipping Package Contents

Allied Telesis AT-GS908M
54 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Chapter 2: Installation
38
Figure 7. Shipping Package Contents
Retaining clip
Management cable
Four rubber feet
One regional AC
power cord
One, two, or four SFP
slot dust covers
(pre-installed).
(for desktop installation)
Two equipment rack
brackets
(not included in AT-
GS908M package)
Four or six bracket screws
(not included in AT-
GS908M package)
AT-GS916M: 4 each
AT-GS924M: 6 each
AT-GS916M
brackets
AT-GS924M
brackets
(pre-installed)

Table of Contents

Other manuals for Allied Telesis AT-GS908M

Related product manuals