EasyManua.ls Logo

Allied Telesis AT-GS908M - Figure 11: Mounting the Switch in an Equipment Rack

Allied Telesis AT-GS908M
54 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Chapter 2: Installation
42
3. Mount the switch in a standard 19-inch equipment rack using four
equipment rack screws (not provided with the switch). See Figure 11.
Figure 11. Mounting the Switch in an Equipment Rack
4. Go to “Installing SFP Transceivers” on page 43 or skip to “Cabling the
Switch” on page 46 if not installing SFP transceivers.

Table of Contents

Other manuals for Allied Telesis AT-GS908M

Related product manuals