EasyManua.ls Logo

Allied Telesis AT-GS908M - Installing SFP Transceivers; Figure 12: Removing the Dust Plug from an SFP Slot

Allied Telesis AT-GS908M
54 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
AT-GS908M, AT-GS916M, and AT-GS924M Switches Installation Guide
43
Installing SFP Transceivers
To install an SFP transceiver, perform the following procedure:
Note
The transceiver can be hot-swapped; you do not need to power off
the switch to install a transceiver. However, you should always
remove the cables before removing the transceiver.
Note
You should always install the transceiver before connecting the
fiber-optic cables to it.
1. Remove the transceiver from its shipping container and store the
packaging material in a safe location.
Warning
An SFP transceiver can be damaged by static electricity. Be sure to
observe all standard electrostatic discharge (ESD) precautions,
such as wearing an antistatic wrist strap, to avoid damaging the
transceiver.
2. Remove the dust plug from an SFP slot. See Figure 12.
Figure 12. Removing the Dust Plug from an SFP Slot
3. Position the SFP transceiver with the label facing up.

Table of Contents

Other manuals for Allied Telesis AT-GS908M

Related product manuals