15
Subject to change without notice | 83057000jUK – Translation of the original operating manual | ait-deutschland GmbH
valves
IMPORTANT
force!
1. -
tion.
2.
3. Push the pipe through the clamping ring up to the
4. Tighten the union nut hand-tight and attach water-
5.
6.
1.
2. Tighten the union nut hand-tight and retighten
the clamping ring is already in a clamping posi-
tion.
Connect the unit to the heat source and
heating circuit
1.
heat source and heating circuit.
2.
3. Insert the vent at the highest point of the heat
source and the heating circuit.
4.
0.9 mm onto the heat source inlet.
5. Ensure that the operating overpressures
( “Technical data / Scope of supply”, from
page 24) are not exceeded.
6.4 Connect the electrical cables
IMPORTANT
Irreparable damage to the compressor due to
the compressor load infeed.
Basic information on the electrical connection
NOTE
Ensure that the unit is supplied with electricity
attaching the unit panelling, switch the power
company may apply to electrical connections
Fit the power supply for the heat pump
with at least 3 mm contact spacing (per
IEC 60947-2)
Note the level of the tripping current
( “Technical data / Scope of supply”, from
page 24)
Comply with the electromagnetic compatibility
regulations (EMC regulations)
Lay unshielded power supply cables and shielded
Maximum line length: 30 m.
The LIN-bus cable must be a shielded cable of at
least 4 x 0.5 mm²