14
We reserve the right to make technical changes.
UK830509/200114 © Alpha-InnoTec GmbH
Isolation of the Hydraulic
Connections
NOTE.
Insulate the heat source and heat circuit
according to the standards and directives
applicable locally.
Check leakproofness of all hydraulic connections.
Perform pressure test…
Insulate all connections, vibration isolation, connec-
tions and lines of the heat circuit and heat source.
Provide steam diffusion-tight heat source insula-
tion.
Rinsing, filling and bleeding the heat CiRCuit
Contamination and deposits in the heating circuit can
lead to operational faults.
CAUTION.
The drainage pipe must be connected to
the safety assembly before rinsing and ll-
ing the heat circuit.
Proceed as follows:
Thoroughly rinse heat circuit…
NOTE.
Rinse heat pump and heating circuit for
about 5 minutes.
Fill heat circuit…
Bleed heat circuit.
Cleaning, Rinsing and bleeding deviCe
Components
CAUTION!
Only customer service personnel author-
ised by the manufacturer may clean and
rinse device components. Only liquids rec-
ommended by the manufacturer may be
used for this.
After rinsing the condenser with chem-
ical cleaning agents, a neutralisation of
residues and intensive rinsing with water
will be necessary. When doing so, observe
the technical data of the relevant heat ex-
changer manufacturer.