Deinstallation
DANGER!
Danger of fatal injury due to electric cur-
rent!
Electrical connections may be installed
only by qualied electricians.
Before opening the unit, disconnect the
system from the power supply and secure
it from being switched back on!
DANGER!
Only qualied heating and refrigerating
plant technicians may remove the device
from the system.
CAUTION.
The antifreeze mixture of the heat source
must not be disposed of into the sewerage
system.
Collect antifreeze mixture and dispose of
properly.
DANGER!
Only qualied refrigeration technicians
may dismantle the device and its compo-
nents.
CAUTION.
Provide the device components, coolant
and oil for recycling or properly dispose of
them corresponding to the applicable reg-
ulations, standards and directives.
Removing the baCkup batteRy
CAUTION.
Before scrapping the heating and heat
pump control, remove the backup battery
on the processor circuit board. The bat-
tery can be removed with a side cutter.
Properly dispose of the battery and elec-
tronic components in line with environ-
mental requirements.
Commissioning
Proceed as follows:
Conduct a thorough installation inspection and go
through the items on the general checklist.
“General checklist”.
The installation inspection will prevent damage
to the heat pump system that could be caused by
incorrect installation work.
Make sure of the following…
•
Clockwise rotary eld of the load power supply
(compressor).
•
Installation and assembly of the heat pump
according to the information in this operating
manual.
•
All electric installation work must be properly
completed.
•
A 3-pole automatic circuit-breaker must
be installed for the compressor. It must have a
contact gap of at least 3 mm.
•
The heating circuit must be rinsed, lled and
thoroughly bled.
•
All valves and shut-off devices of the heating
circuit must be open.
•
All pipe systems and components of the system
must be sealed.
Carefully ll out and sign the completion report for
heat pump systems…
“Completion report for heat pump systems”.
In Germany:
Send completion report for heat pump systems
and general checklist to the manufacturer’s factory
customer service department.
Outside of Germany:
Send completion report for heat pump systems
and general checklist to the manufacturer’s local
partner.
Overview “Customer service”.
The heat pump system will be commissioned by
customer service personnel authorized by the
manufacturer. There is a fee for commissioning!