EasyManua.ls Logo

Alto-Shaam Converge CMC-H2H

Alto-Shaam Converge CMC-H2H
124 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
INSTALLATION
Converge® Operator’s Manual MN-47239 Rev 3 5/23
39
Continued from previous page
7. Connect the supply cord to the appropriate terminals (L1, L2, L3, etc.) in
accordance with local codes and regulations.
Install the ground wire 4.
Leave an extra loop 5 so that current-carrying conductors become taut
before the ground wire if the cord is accidentally pulled. Follow applicable
regulations.
8. Re-install the main disconnect switch.
9. Re-install the mounting bracket.
10. Re-install the top cover.
Press reset button(s) 11. Press and release the high limit temperature reset button(s) 6.
Result The oven is now installed and ready to be used.
CT-TS-012047
f
g
CT-TS-012050
h

Table of Contents

Other manuals for Alto-Shaam Converge CMC-H2H

Related product manuals