MAINTENANCE
Converge® ▪ Operator’s Manual ▪ MN-47239 ▪ Rev 3 ▪ 5/23
96
Continued from previous page
▪ Inspect all drain hoses and clamps.
▪ Inspect all steam water injection lines and clamps for leaks or potential issues.
▪ Inspect wiring to heating elements. Re-tighten or secure as needed. Record the
amp draw.
▪ Inspect wiring to the steam element. Re-tighten or secure as needed. Record the
amp draw.
▪ Inspect the cleaning system pump and hoses for leaks and proper operation.
▪ For ovens shipped to New Zealand or Australia, inspect the back flow preventer
check valve per AS/NZ3500.1 and AS/NZ3500.2
▪ Check operation of all electrical cooling fans.
▪ Check all electrical connections are properly connected and secure to the
boards.
▪ Check door hinges and handles. Tighten, secure, or adjust as needed.
▪ Check door gaskets for damage and seal.
▪ Test steam injection solenoid.
▪ Test condensate solenoid.
▪ Run each chamber in convection mode and test operation.
▪ Run each chamber in steam mode and test operation.