EasyManuals Logo

Ametek NetWave 20 User Manual

Ametek NetWave 20
140 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #113 background imageLoading...
Page #113 background image
AMETEK CTs NetWave
Possible device configuration at Opt-3 CS :
CS = CascadeSource
20
CS
20.2
CS
20.3
CS
30
CS
30.2
CS
30.3
CS
67
CS
67.2
CS
67.3
CS
90.2
CS
90.3
CS
108.3
CS
AC Voltage (L-N) (3 Phase)
300
360
400
300
360
400
300
360
400
360
400
400
AC Voltage (L-N) (1 Phase)
600
720
800
600
720
800
600
720
800
720
800
800
DC Voltage
850
1000
1120
850
1000
1120
850
1000
1120
1000
1120
1120
Output Power AC (kVA) (3 Phase)
22.5
22.5
22.5
30
30
30
67
67
67
90
90
108
Output Power AC (kVA) (1 Phase)
45
45
45
60
60
60
134
134
134
180
180
216
Output Power DC (kW)
54
54
54
64
64
64
144
144
144
220
220
300
Output Current continuous (A)
78
78
78
99
99
99
225
225
225
300
300
300
Output Current sh. ter. (max. 3s) (A)
141
141
141
198
198
198
300
300
300
450
450
450
Output Current repetitive peak (A)
400
400
400
500
500
500
600
600
600
1000
1000
1000
NetWave 20 with Opt-3 Parallel
2x
NetWave 20.2 with Opt-3 Parallel
2x
NetWave 20.3 with Opt-3 Parallel
2x
NetWave 30 with Opt-3 Parallel
2x
NetWave 30.2 with Opt-3 Parallel
2x
NetWave 30.3 with Opt-3 Parallel
2x
NetWave 60 with Opt-3 Parallel
2x
NetWave 60.2 with Opt-3 Parallel
2x
NetWave 60.3 with Opt-3 Parallel
2x
NetWave 90.2 with Opt-3 Parallel
2x
NetWave 90.3 with Opt-3 Parallel
2x
NetWave 108.3 with Opt-3 Parallel
2x
Opt-3 Recovery
opt.
opt.
opt.
opt.
opt.
opt.
opt.
It is not possible to put several CascadeSource-NetWave sources in parallel to increase the max. voltage or current further.
Additional a connection box is available (Connection L, N, PE and for each line sense) :
CB-CS-20/30
Connection box with 2 sense connections,
1phase Input/Output, 6 power cable, 2 sense
cables with connectors for connection of 2
NetWave 20 or NetWave 30 in
CascadeSource
CB-CS-67
Connection box with 2 sense connections,
1phase Input/Output, 6 power cable, 2 sense
cables with connectors for connection of
NetWave 67 in CascadeSource
CB-CS-90/108
Connection box with 2 sense connections,
1phase Input/Output, 6 power cable, 2 sense
cables with connectors for connection of 2
NetWave 90 or NetWave 108 in
CascadeSource
9.5. Power mains matching transformer
- 3 Phase mains matching transformer 208 V to 400 V
- 3 Phase cable to connect the matching transformer
9.6. Framebus Termination
- Framebus terminating for matching the end of the Framebus. The
framebus, an internal bus system, is used for control EM Test devices
and work as daisy chain between the equipment. Longer bus systems
must be terminated with a Framebus termination.
- NetWave with 3-phase have already built in the frame bus terminating.
- ERP number 101732

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Ametek NetWave 20 and is the answer not in the manual?

Ametek NetWave 20 Specifications

General IconGeneral
BrandAmetek
ModelNetWave 20
CategoryIndustrial Equipment
LanguageEnglish

Related product manuals