EasyManua.ls Logo

Ametek NetWave 20 - Functions; 4.1. Front Panel Controller Overview

Ametek NetWave 20
140 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
AMETEK CTs NetWave
4. Functions
4.1. Front view controller
1 LED Trigger
2 LED Running
3 LED Power
4 Test ON Button
5 Mode
6 Start
7 Stop
8 Cursor "" ""
9 Setup
10 LED output active L1 or Lines L1/L2/L3
11 Output plugs High / Low / PE ( NetWave 3/7)
12 Display
Power on switch
Power ON switch for NetWave. The system needs
approx. 35 seconds for booting.
1. LED Trigger
The LED Trigger indicates
- Manual, external or remote trigger event
- Start of a sequence
2. LED Running
The LED Running indicates the running play- or
measuring status
3. LED power
The LED power indicates the power on status.

Table of Contents

Related product manuals