AMETEK CTs    NetWave 
Possible device configuration at Opt-3 CS : 
AC Voltage (L-N) (3 Phase) 
AC Voltage (L-N) (1 Phase) 
Output Power AC (kVA) (3 Phase) 
Output Power AC (kVA) (1 Phase) 
Output Current continuous (A) 
Output Current sh. ter. (max. 3s) (A) 
Output Current repetitive peak (A) 
NetWave 20 with Opt-3 Parallel 
NetWave 20.2 with Opt-3 Parallel 
NetWave 20.3 with Opt-3 Parallel 
NetWave 30 with Opt-3 Parallel 
NetWave 30.2 with Opt-3 Parallel 
NetWave 30.3 with Opt-3 Parallel 
NetWave 60 with Opt-3 Parallel 
NetWave 60.2 with Opt-3 Parallel 
NetWave 60.3 with Opt-3 Parallel 
NetWave 90.2 with Opt-3 Parallel 
NetWave 90.3 with Opt-3 Parallel 
NetWave 108.3 with Opt-3 Parallel 
It is not possible to put several CascadeSource-NetWave sources in parallel to increase the max. voltage or current further. 
Additional a connection box is available (Connection L, N, PE and for each line sense) : 
 
Connection box with 2 sense connections, 
1phase Input/Output, 6 power cable, 2 sense 
cables with connectors for connection of 2 
NetWave 20 or NetWave 30 in 
CascadeSource 
Connection box with 2 sense connections, 
1phase Input/Output, 6 power cable, 2 sense 
cables with connectors for connection of 
NetWave 67 in CascadeSource 
Connection box with 2 sense connections, 
1phase Input/Output, 6 power cable, 2 sense 
cables with connectors for connection of 2 
NetWave 90 or NetWave 108 in 
CascadeSource 
9.5. Power mains matching transformer 
- 3 Phase mains matching transformer 208 V to 400 V 
- 3 Phase cable to connect the matching transformer 
9.6. Framebus Termination 
-  Framebus terminating for matching the end of the Framebus. The 
framebus, an internal bus system, is used for control EM Test devices 
and work as daisy chain between the equipment. Longer bus systems 
must be terminated with a Framebus termination. 
 
-  NetWave with 3-phase have already built in the frame bus terminating. 
 
-  ERP number 101732