EasyManua.ls Logo

ARB 6174921 - Page 13

ARB 6174921
32 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
10-02-2020 Page 13 of 32 ARB Copyright 2017 3789736
If you have any queries regarding the installation of this product please contact the distributor from whom it was purchased, or alternatively the ARB office in your state.
Head Office – ARB Corporation Ltd VIC: 42-44 Garden Street, Kilsyth, Victoria, 3137 Tel: (03) 9761 6622 Fax: (03) 9761 6807
WA:(08) 9244 3553 NSW: (02) 9821 3633 ACT: (02) 6280 7475 SA: (08) 8244 5001 QLD: (07) 3872 3872 NT: (08) 8947 2262 TAS: (03) 6331 4190
3.4) Curve the seal without puckering around the
front corners and apply it no further forwards
than half the width of the rubber seal bridge.
Ensure the double-sided tape on the seal goes
up the ramp of the tub bridge and is not
stepped up across the corner of the tub bridge
which could cause water leaks. Apply firm
pressure to the seal over the tub bridge rubber
extrusion.
3.5) Apply the seal along the front head board bracket
aligned at 20mm offset between the inner edge
of the seal and the inner edge of the head
board rail. Apply the seal with firm pressure to
the tub.
3.6) Finish applying the seal to the other side of the tub.
3.7) Apply neutral cure silicon to edge of the bed seal
around the front corners both inside and outside of
the seal. Clean off excess with a rag applied
sparingly with silicon remover or wax and grease
remover carefully.
3.8) Apply neutral cure silicon to inside of each end of
the rail top corners. Clean off excess with a rag and
silicon remover or wax and grease remover
carefully.
20mm

Related product manuals