Argus E25 MOD II - Operating Instructions
When the tension is released, remove
the timing belt and replace it with a
new one.
Reassemble in the reverse order to
that described above.
All ot
her types of repair work are only to
be carried out by the manufacturer or by
personnel authorised to do so by the
manufacturer.
Taking the unit out of service
Remove hazardous substanc-
es
units installed in
there is a danger of severe
lethal injury from hazardous
on the unit.
Work on contaminated units
shall only be carried out by
specialist personnel.
Wear the specified protective
clothing during all work in the
contaminated area.
Make sure the unit has been
fully decontaminated before
working on it.
During such work follow the
instructions for handling the
hazardous media concerned.
Make sure the unit is discon-
nected from all electric power
supplies.
Make sure the plant is
switched off and secured
against unauthorised switch-
ing back on.